Most Dome LED systems are designed for indoor use, but depending on project conditions, they can also be adapted for semi-outdoor or specialized outdoor environments.
Timelines vary by dome size and complexity, but most projects take several weeks from design to installation. Short-term events can minimize on-site time through off-site preparation.
Key requirements include ceiling height, floor load capacity, power supply, and access routes. A site survey is conducted to confirm feasibility.
Consultations are best started at least three months before the event to allow proper planning for structure, technology, and content.
Existing content can be reused, but dome-specific mapping and adjustments are required. Content adaptation and creative support can be provided as part of the project.